Engineering systems from affordable polypropylene pipes can last up to half a century. Polymer tubular products are extremely easy to install, only one soldering iron is needed to connect them. But is this material suitable for heating systems? Will the boiler piping polypropylene durable and reliable?
If everything is done according to technology, then plastic pipelines quite safely deliver the coolant to the batteries.
What is the boiler piping and what does it consist of?
The harness is a combination of heating equipment that ensures the transportation of heated water to radiators and the failure-free operation of the heater itself.
On the one hand, it helps to evenly distribute heat throughout the house, and on the other, it increases the reliability of the entire heating system, protecting the boiler from overheating and excessive fuel consumption.
There are certain nuances in the boiler equipment strapping device:
Image Gallery
Photo from
The specifics of the assembly of polypropylene pipelines
Pipe assembly fittings
Piping PP (PP) of a gas double-circuit boiler
Solid fuel boiler pipes
The heating system with an electric boiler
Tandem with gas single-circuit boilers
Open heating pipe
Closed piping method
Also, by strapping the heating apparatus is meant the calculation of the parameters of all elements of the internal heating system and their installation. The heating system must work not only reliably, but also correctly. A large number of additional devices and complex wiring can seriously reduce its effectiveness. Everything must be done correctly.
Correct piping increases the efficiency of the water heater and its reliability
There are simply no optimal heating systems for buildings without exception. To achieve the maximum return on a particular boiler, it is necessary for each house to prepare an individual heating system project individually. But there is a certain set of standard rules and a list of typical equipment.
In the simplest scheme of the heating boiler strapping during gravitational movement of the coolant, a minimum of shut-off and control devices
Depending on the type of fuel used, the quadrature of the house, the model of the heater and its location, polypropylene strapping is done according to various schemes.
But in all of them there are:
- Boiler (single-circuit or dual-circuit).
- Expansion tank. Hydraulic with a diaphragm or a conventional tank depending on the type of heating system.
- Polypropylene pipes and fittings.
- Batteries (cast iron, steel, aluminum, bimetal).
- Bypass (sections of the pipeline that allow you to disconnect individual devices from the circuit). Recommended for all types of networks, but not always used in simple flow diagrams.
According to the principle of coolant movement, the heating circuits are divided into systems with natural (gravitational) and artificial (pumping or forced) circulation.
The circulation pump is a mandatory component of forced-type heating. It is needed to stimulate the movement of the coolant (+)
In a forced-type heating network, the above set is complemented by:
- Mayevsky crane.
- Circulation pump.
In a circuit with a coolant supply to each device, a collector - a distribution device - is necessarily included on the supply and return pipes intended for it.
In heating circuits that require mandatory adjustment of the qualitative and quantitative characteristics of the circulating liquid or steam, control devices are built in:
- Pressure gauge.
- Thermostat.
- Hydraulic needle if pressure equalization is necessary.
An expansion tank with a membrane is placed in a system with forced circulation of the coolant to maintain a given pressure in it. And in its gravitational analogue, an ordinary open tank without any inserts inside will be enough.
The expansion tank of systems with the natural movement of water is in contact with the external environment, due to which they can be saturated with air. To prevent this phenomenon, systems are supplemented with an air circuit that collects and removes air
The expansion tank of the simplest heating system with the natural principle of movement is an ordinary tank with a pair of pipes screwed in or welded into it. One of them is a supply pipe, the second is a signal pipe, which tells about filling the tank with water that expanded when heated. In a more complex version of the tank, four pipes are already screwed.
With an increase in the coolant volume above the norm, the excess is simply discharged through the signal pipe. In the future, the coolant will expand in the same way and take the previous volume, but there will be no overflows into the signal pipe. By analogy, air is vented spontaneously, so there is no need to install Mayevsky cranes.
Between the boiler and polypropylene pipes a control and safety group is built from various sensors, regulators and emergency valves
Circulation pumps in circuits based on the natural principle of movement of the coolant are not used. In such a system, water moves under the influence of gravity.
She does not need additional pressure boosters. On the one hand, this increases the reliability of heating (there is simply nothing to break down), and on the other, it reduces the quality of heating the far rooms in the house (the coolant reaches the extreme ones already cooled down).
The intricacies of installing a heating system made of polypropylene pipes are described in detail in one of the popular articles posted on our website.
Polypropylene pipes in heating systems
Polypropylene fittings and pipes (PPR) are popular for their low cost and ease of installation. They are not subject to corrosion, have smooth internal walls and serve no less than 50 years declared by the manufacturer.
There are several types of these tubular products, which differ in technical characteristics and purpose.
In the construction of heating systems, as well as in the design of hot water circuits close to them in operational parameters, the following are used:
- Pipes marked PN 25. Products with reinforcement made of aluminum foil. They are used in systems with a nominal pressure of up to 2.5 MPa. Operating temperature limit + 95º С.
- Pipes marked PN 20. A reinforced version used in hot water branches of double-circuit heating boilers. The period declared by the manufacturer will be fulfilled if the temperature of the coolant is not higher than + 80º C, and the pressure is up to 2 MPa.
- Pipes marked PN 10. Thin-walled polymer products. Used if the boiler supplies the heating medium to the underfloor heating system. Operating temperature not higher than + 45º С, nominal pressure up to 1 MPa.
Polymer pipes are suitable for all known laying methods: open and hidden. But this material has a large coefficient of thermal expansion. When heated, such products begin to slightly increase in length. This effect is called thermal linear expansion; it must be taken into account when constructing pipelines.
The boiler should be tied with polypropylene pipes, which in the marking have an operating class of 5, an operating pressure of 4–6 atmospheres and a nominal pressure of PN 25 and higher
To prevent the destruction of polypropylene heating pipelines, compensation loops can be installed. But it is easier to take multilayer pipes, the reinforcement of which is specifically designed to compensate for this extension. A layer of foil inside polypropylene pipes PN 25 reduces their thermal elongation by half, and fiberglass by all five times.
Image Gallery
Photo from
The device for welding of pipes of software of large diameter
Features of welding wide plastic pipes
Connection of narrow polypropylene pipes
Apparatus for connecting small diameter PP pipes
Features of installation of PPR pipelines
When tying the boiler, polypropylene pipes and fittings are connected mainly by cold or hot welding, in the case of connecting to metal pipelines, threaded connections are used. Screwing is much more convenient, but because of them the assembly of the system will cost much more.
True, if you want to connect a polypropylene pipeline to a metal colleague, you can not do without threaded fittings.
An extensive line of fittings is available for forming linear and nodal joints of polypropylene pipes.
“Hot” is welded with a special apparatus (soldering iron, “iron”). The pipes are heated with a suitable nozzle to a melting point of 260 degrees, and then the parts with softened edges are pressed against each other. The result is a reliable and monolithic connection.
Before welding, the foil of reinforced pipes must be cleaned without fail. Otherwise, it will interfere with the connection of polymer products, making the seam fragile. With fiberglass, these extra steps will not be required. It melts quietly with plastic.
PPR soldering technology is extremely simple, all work can be done with your own hands (+)
Cold welding involves the use of specialized adhesives. In recent years, this method is rarely used, because the result is not reliable enough.
In heating systems, threaded joints should be sealed with paronite or high-temperature sealant. Do not forget about the sufficiently high operating temperature of the coolant.
There is one more nuance of using polypropylene for tying a heating boiler. Antifreeze with plastic is a rather bad combination. It is recommended to use water as a coolant for a system of plastic pipes.
Choosing a heating system wiring diagram
There are several options for tying the boiler with polypropylene. For each house, this scheme is selected individually. What is optimal in one building may be ineffective in another.
In addition, heating systems according to the principle of movement of water are divided into: forced with a hydraulic pump and gravity (gravity, natural), there is still a classification for the arrangement of pipelines. According to their structure, they are one- and two-pipe, collector beam or analogs with closed rings.
Which is better: gravity or pump?
In the gravitational circuit, heated water to the radiators from the boiler flows by gravity. A hot heat carrier having a high temperature always tends to replace a colder liquid with it. This heating boiler piping system is the easiest to assemble. In addition to the heater, there are pipes made of polypropylene, radiators and an expansion tank.
In the variant with the top wiring, the water rises to the highest point after heating - to the expander, and from there it goes down to the batteries. After heat transfer, it returns to the boiler, where it is again heated, then starting a new cycle.
According to this scheme, heating is arranged in many houses in domestic villages. Only there is a solid fuel stove. This is the easiest and cheapest way to organize the heating of a small cottage.However, it has limitations both in the number of connected radiators and in the remoteness of the last of them from the water heater.
The layout of the harness with the natural movement of water is the simplest of all possible options, it has a minimum of nodes and connection points for pipes made of polypropylene
A more complex and expensive enforcement system. However, it greatly simplifies the creation of comfortable temperatures in individual rooms. In it, the coolant moves already due to the stimulation of its movement by the pump.
The choice of the layout of polypropylene pipes and the boiler itself are closely related. The natural circulation system is non-volatile. If the water heater in it does not require power from the mains, then even in case of power outages, the house will be heated.
In a forced circuit, the pump needs a constant power supply to operate. Therefore, it is best to select a boiler for it dependent on electricity, which has additional features. But to insure against voltage problems, you will have to buy a backup generator or uninterruptible power supply to them.
Which heating scheme is better to choose?
There are many ways to separate pipelines from polypropylene from the boiler to heating radiators.
But all these schemes are divided into:
- single tube;
- two-pipe.
In single-pipe systems, the heated water supplied as a heat transfer medium is supplied and discharged by a single pipe. In two-pipe for supplying coolant and return, i.e. drainage of cooled water back to the boiler for heating, separate lines are being constructed.
According to the method of connecting the working components, the heating circuits are divided into:
- tee;
- collector.
Tee types can be used both with gravity and forced circulation. The collector circuit can only work if there is a circulation pump.
The one-pipe scheme is obviously cheaper than the two-pipe, but the radiator distant in the chain from the boiler in it receives a minimum of thermal energy (+)
The one-pipe method involves the laying of one looped line and the series connection of batteries to it. In a two-pipe scheme, two independent pipelines with hot water and return are coming from the boiler. And already radiators are connected to them.
With collector piping, one or two collectors are built into the system, from which separate pipes are thrown to each battery. Also, such a distributor allows you to connect to the boiler "warm floor", made all of the same PPR.
Collector wiring makes it possible to create effective heating systems for houses of large area and different storeys (+)
The use of collectors and separate risers for each battery leads to a significant increase in the cost of both design and installation. At the stage of project preparation, more complex calculations have to be done. And during assembly, a much larger volume of polypropylene is consumed. But then a system is obtained, each part of which can be adjusted to specific conditions and requirements.
Polypropylene circuit for different boilers
Most manufacturers of water heaters recommend the first meter of the pipeline from it to be made of metal. This is especially true for solid fuel devices with a higher outlet water temperature. When strapping, polypropylene should already be connected to this branch, otherwise, in the event of a malfunction in the boiler, it will receive a heat stroke and may burst.
Option # 1: Gas Water Heater
Polypropylene tying of a gas boiler is recommended to be carried out using a hydraulic arrow and a collector. Often, gas models are already equipped with built-in pumps for pumping water. Almost all of them were originally designed for forced systems.
The most reliable in terms of safety will be a circuit with circulating equipment for each circuit behind the collector.
In this case, the built-in pump will pump pressure in a small section of the pipeline from the boiler to the distributor, and then additional pumps will be involved. It will be on them that the main burden on pumping the coolant will fall.
It is possible to tie a gas boiler with polypropylene without long metal pipes, the water in such a heater rarely heats up to 75–80 degrees
If the gas boiler has a cast-iron heat exchanger, then when tying it into the system, an additional heat accumulator should be installed. It will smooth out sudden changes in water temperature, which have a negative effect on cast iron. With spasmodic heating or cooling of the coolant, it can even burst.
When strapping a dual-circuit apparatus with parallel heating of water for domestic hot water, additionally fine and rough filters will have to be installed on this branch. They should also be mounted at the entrance to the water heater, where cold water is supplied.
Option # 2: Solid Fuel Model
The main feature of a solid fuel boiler is its inertia when the fuel supply is cut off. Until everything in the furnace burns out completely, he will continue to heat the coolant. And this can adversely affect polypropylene.
When tying a solid fuel boiler, only metal pipes should be connected immediately to it, and only after a meter and a half can polypropylene be embedded. In addition to this, it is necessary to provide a backup supply of cold water for emergency cooling of the heat exchanger, as well as its discharge into the sewer.
A section of the pipeline from the solid fuel boiler to the collector should be made of metal, and then you can strand with polypropylene - only this will protect the plastic pipes from overheating
If the system is built on forced circulation, then it will definitely need to install an uninterruptible power supply for the pump. Water must constantly remove heat from the furnace, where solid fuel burns, even in the event of a power outage.
In addition to it, you can make a small gravity circuit or equip all batteries with bypasses to disconnect individual sections of the system. In case of accidents, this will allow repairing the damaged section when the heating is running.
The solid fuel boiler must be covered with a protective casing, which limits the spread of heat from the walls of the furnace to the boiler room. But even with it, the collector and plastic pipes should be removed away from the stove.
Option # 3: Oil Fuel and Electric Heaters
A developmental or diesel boiler is tied with polypropylene in an identical pattern with a solid fuel analogue. The polymer must be removed from it as far as possible.
When tying an electric PPR boiler, you don’t have to worry about pipe breaks, it has protective automation that prevents water from reaching a boil
Heating the coolant in an electric water heater to temperatures critical for polypropylene is practically excluded. In the event of a power failure, it simply stops working. In this case, the pipes are protected against water hammer by a hydraulic accumulator and valves to relieve excess pressure.
Video # 1. How to choose pipes from PPR:
Video # 2. Solid fuel boiler piping technology:
Video # 3. How to tie a heater in a two-story cottage:
When choosing a boiler piping scheme made of polypropylene pipes, it is necessary to take into account all the features of a particular building. The process of installing pipelines and connecting equipment is simple, even a novice master can cope with it.
Using a soldering iron for polypropylene fittings and pipes is easier than ever. But it’s better to entrust the specialist with the preparation of the heating system design, errors are unacceptable here.
If you want to share personal experience gained during your own assembly of polypropylene strapping, have you found any shortcomings or would you like answers to your questions? Please write comments in the block below the test article.